Industry solutions

Warehouses & Industrial Parks

Turn large roofs and shared infrastructure into productive water and energy assets.

The operating challenge

Warehouses and industrial parks offer large catchments but need coordinated drainage, storage, recharge and shared utility planning across multiple users.

What matters at this type of site

Large roofs, yards, loading areas, roads and parking generate significant runoff, while tenants may share water sources, sewage systems, borewells and common services. The site therefore needs clear collection zones, overflow routes, metering and responsibility between owner, operator and tenants.

SWR can map roof and paved catchments, plan first-flush and storage, assess recharge, review shared treatment and metering, and identify rooftop solar opportunities so the park's common infrastructure works as one system.

Where SWR can help

  • Large-roof collection and first-flush planning
  • Storage and suitable non-potable reuse
  • Distributed recharge pits, trenches and shafts
  • Shared treatment, metering and monitoring

A practical programme

Connect the right systems to the way your site actually operates.

  1. 01Large-roof collection and first-flush planning
  2. 02Storage and suitable non-potable reuse
  3. 03Distributed recharge pits, trenches and shafts
  4. 04Shared treatment, metering and monitoring
  5. 05Rooftop solar assessment for common facilities

What the programme can support

01

Productive use of roof and paved areas

02

Reduced runoff and flooding pressure

03

Scalable shared infrastructure for tenants

Frequently asked

Questions from project teams.

How should a multi-tenant park divide responsibility?+

The plan should identify collection, storage, treatment, metering, maintenance and reporting responsibilities for the owner, operator and individual tenants.

Can large roofs support more than recharge?+

Yes. After quality, demand and storage are assessed, roof runoff may support suitable non-potable uses, recharge or a combination of both.

Can SWR plan a phased park-wide programme?+

Yes. A common master plan can prioritise high-yield roofs, critical drainage, shared treatment, monitoring and future tenant connections.

Start with your site

Let's turn the requirement into a practical roadmap.

Discuss your project ↗
START CHAT